Windmill 7.3
|
|
Features |
|
|
|
Business Modelling
|
Calendars
- Multiple calendars of variable working week pattern
- Week patterns can change during project
- Optional division into periods (up to 99 per day)
- Multiple holidays definable on each calendar
- All calendar dates Year 2000 Compliant
- Show years in two digit 99 or four digit 1999 style -

|
Resources
- Multiple resources within each project
- Resources defined as 'monitor', 'schedule' or 'cost'
- Twin resource limits definable:
- as total availability or permitted peak
- as variable normal availability profile
- Resource unit cost may be applied
- Resource allocation by total value or continuous rate
- Resource rollup by code and group codes
- Tasks can be selected/grouped according to resource used
- Resource may be linked to specified calendar or task calendar
|
Dates/Durations
- Dates represented by:
- month/day/year calendar format (9 permutations)
- show years in two digit 99 or four digit 1999 style -

- week numbers day numbers
- day numbers
- numeric (days) scale
- annual week numbers on bar chart reports
- Project date/Time now for automatic update on current
analysis
- Free calendar date format on data entry
- Calendar style pop-up prompt panel for dates
|
|
Project Modelling
|
Projects
- Project task logic by precedence or successor logic entry
- Master project controlling multiple sub-projects
- Sub-projects each of unlimited task capacity
- Add logic links directly between tasks in different
sub-projects
- Extract and remotely edit individual sub-projects
|
Tasks
- Task name identifiers:
- numeric between 1.00 and 99999.99
- trim leading spaces and trailing digits
- alphanumeric task numbering
- Long and short task description fields
- Management code for multiple level coding of tasks
- Task definition as schedule/hammock/dummy/key(milestone)/
parent
- Task durations:
- estimated task duration
- minimum/maximum durations (for scheduling) -

- actual task duration
- actual complete/remaining durations
- Link task to any project calendar
- Target start/finish dates for external date constraints
- Imposed start/finish dates for manual location of tasks
- Priority code for use in resource scheduling
- Flexible hierarchical coding structures:
- work breakdown structure (WBS)
- organisational breakdown structure (OBS)
- responsibility coding structure (RSP)
- Notepad text entries
- Maintain a list of application files associated to each task
- Enter an ongoing diary of notes and events for each task
|
Progress
- Progress can be monitored by:
- actual start/finish dates
- remaining duration
- expected finish date
- percent complete
- percent remaining
- percent work done
- Update task progress on data grid
- Update tasks using mouse on bar chart display
|
Precedence Logic
- Logic links can be defined as:
- finish to start, start to start, finish to finish
- positive/negative logic delays
- logic delays allocated to project calendars
- logic links between sub-projects
- Logic link entry by precedent or successor logic on grid
display
- Add and remove logic links using mouse on bar chart display
- Add sequential or parallel logic links using toolbar buttons
-

|
Resource Allocations
- Resources can be allocated in a number of ways:
- as a value (budget); either a rate or a total value
- over part of the task duration with optional delay
- Completed value of resource expended held
- Remaining value of resource to task completion held
- Full support for earned value analysis
|
Organisational Utilities
- Create sub-projects within a project
- Copy tasks between sub-projects
- Delete sub-projects within a project
- Renumber tasks within a sub-project (numeric task numbers)
- Create task templates for rapid compilation of projects -

|
|
Project Scheduling
|
Schedule Types
- Time schedule
- Resource limited schedules
- resource limited schedule
- time limited resource schedule -

- duration schedule -

|
Task Scheduling
- This is achieved automatically by:
- task precedent logic
- priority code
- float
- specified start dates and progress details
- target dates
- maximum/minimum duration limits -
- resource availability
- permitted resource overload within limits
- Manually fix tasks in time
|
|
Management Information
|
Project Information
- Global project information can be shown as:
- project completion time
- project start/finish dates
- sub-project durations
- sub-project early/late start and finish dates
- summary bar chart and resource histogram reports
|
Task Information
- Task information can be shown as:
- all task input information
- task early/late start and finish
- task actual duration
- duration complete/remaining
- total float and free float
- negative float (super-critical tasks)
- preceding float (stretched tasks)
- task working status (future/working/actual)
- task status (scheduled/critical/resource limited) -

- tasks restrained by resource availabilities -

|
Resource Information
- Resource information can be shown as:
- resource demand per unit of time (histogram)
- resource demand consolidated into variable time periods
- daily, weekly, monthly, quarterly, annual periods
- average, total, accumulated values
- s-curve calculation
- % of total requirement
- combine resources across group codes
- earned value analysis based on task work completed
- Resource demand can be shown by:
- budget or actual values
- unit cost of resource
- task selection within each sub-project
- current or baseline scheduled dates
- early or late scheduled dates
- Spreadsheet display for resource information:
- display of multiple resource types
- consolidate values into variable time periods
- sum different resources into total vlaues
- copy and paste resource values between applications -

- save worksheets for subsequent load and view of values
|
Baseline Information
- Multiple baselines within each project
- Baselines preserve scheduled results for tasks
- Baseline results available for all reports, bar charts and
histograms
- Partial updating of baselines incorporating changes
|
General Operation
- Data entry modification by task grid forms
- Pop-up panels for prompts and confirmations
- Full data checking
- Global editing across tasks with search/replace, case change
etc. -

- Pull-down menu selection throughout
- Support of function keys and hot keys
- Configurable toolbar buttons -

- Help displays on-screen
- On-screen reports with full select and sort facilities
- 20 screen report formats
- User definable screen formats
- Split screen barchart/histogram display
- Two-way scrolling and find/goto operations
- Pop-up panels for filenames and loading sub-projects
- Fully integrated mouse capability
- Tips displays on bar charts, grid values and grid titles -

- Print grid functions for instant data printing
- Direct access to all Standard Reports and Extended Schedulers
-

- Configurable pop-up prompts for
- Management Code
- Work Breakdown Structure (WBS)
- Organisational Breakdown Structure (OBS)
- Responsibility Planning (RSP) codes
|
|
Reporting
|
|
|
Reports Toolkit
Sample Reports
- Step by step wizard to create fully functional reports -

- User-defined report layout and page design
- Reports written to printer, file, HTML for Internet/Intranet
or screen
- Command language controlling
- calculations
- text manipulation
- task selection
- format selection
- output options
- Direct parameter substitution into report formats
- Calculations using Hornet parameters, derived data and user's
own parameters
- Full text variable, mathematical and logical operators
- Extended report selection options
- Full colour selection and font control -

- Include line shapes, symbols and image bitmaps on report
design
- Screen editor for report formats and command macros
- Library management of report formats, commands and other
reporting utilities
- Full range of paper sizes supported
- Reports written to printer, file, HTML for Internet/Intranet
or screen
- Preview reports before printing
|